DAVID

Small is intelligent




David against Goliath


Contact:

Norman Marenco
Phone +49 4821 17-4620
Fax +49 4821 17-4690
norman.marenco@
isit.fraunhofer.de

Fraunhofer-Institut für Siliziumtechnologie ISIT
Fraunhoferstraße 1
25524 Itzehoe


Visions & Objectives

The DAVID project targets to provide an extremely high packaging density for hybrid integration of MEMS with ASICs. A significant reduction of assembly and packaging costs, specifically for consumer applications, shall be reached by the integration approach itself, but also by a lithographic size reduction of micromachined structures. The benefit becomes most visible when several sensors are clustered in a single, hermetic encapsulation on wafer level.

Beyond this, a "3D-SiP" approach can improve product quality by reducing parasitic effects: DAVID's extremely short interconnects are particularly interesting for capacitive or high-frequency signals.

The project is designed to demonstrate a complete process flow with the following technology components:

  • vertical interconnect by post-CMOS feedthroughs
  • handling, assembly and waferlevel bonding of singulated, open MEMS devices on a CMOS wafer
  • vacuum sealing and fine structured getter films to control the sensor cavity ambient
  • waferlevel molding and solder balling to build a chip-scale MEMS-SiP.

Critical aspect like mechanical drift and offset effects of package stress are addressed by the implementation of a test vehicle that allows to measure and correlate them with FEM simulations. A control of design and material suitability is therefore given through all process stages.



DAVID Partner
Fraunhofer Institut für Siliziumtechnologie
ST Microelectronics, Italy
Datacon Technology
FICO Molding
SAES Getters
Wroclaw University of Technology


Public Funding

Information Society Technologies


The DAVID project was supported with 2.8 M€ funding by the European Commission under the Sixth Framework Programme, Priority IST-2004-2.4.2: “Technologies and Devices for Micro-/Nano-Scale Integration”. The total cost was above 5.3 M€ over a duration of 3,5 years (contract number IST-027240 from 1.1.2006 to 30.06.2008, including a 6 months extension period).